THIS IS CWW – The Way is Clear

Veteran Leadership. Unequalled Credibility.     
CWW was founded in 2005 by industry veteran, John D. Brule. With 25 respected and successful years of industry knowledge, know-how, and market leadership to his credit – and with the nation’s leading pipeline rehabilitation specialists on board – CWW was incorporated, and entered the field of concentrated pipeline rehabilitation.

One Clear Objective     
With its headquarters in Ottawa, and operating from central Canada through eastern Ontario, CWW is one of the nation’s foremost Pipeline Rehabilitation Contractors serving contractors and municipalities, as well as residential, commercial, industrial, and institutional markets. Accountable for providing time- and field-proven engineering methodologies, CWW’s skilled professionals continue to earn the admiration and trust of their valued customers. How? CWW embraces one consistent objective: facilitating clean, seamless, and uninterrupted water flow with the absolute minimum of disruption and inherent costs through the use of the industry’s latest technologies.

This is the Way     
With a suite of comprehensive water main and waste water main services, CWW made Trenchless Technology its core specialty, and for good reason. With the advent of aggressive and superior Trenchless Technologies, conventional dig-and-replace methods have rapidly become antiquated. Inherent traffic congestion; delays; re-routing; business/revenue losses; and the high cost of excavation in proximity to gas and cable utilities make ‘no-dig’ Trenchless Technology the prudent and fiscally responsible alternative to conventional dig-and-replace methods.

Whenever – Wherever it Happens     
Where regular business hours are more often than not the order of the day for the world at large, water main and waste water main issues aren’t dictated by the clock. Timely response is critical, and CWW is ready. Whether there is a need to develop and maintain temporary water flow systems to protect residences from potential disruptions to water service during excavation projects, whether an existing work site has been compromised by vandalism or other external forces, or whether waste water mains back up at the most inopportune time, CWW’s skilled and accountable pipeline rehabilitation crews are poised to rapidly and reliably rectify water main issues 24 hours a day – 7 days a week – on-site and on-call.