Water Main CIPP Lining      

For water mains that exhibit the following issues:

  • Poor hydraulic performance
  • Reduced water flow
  • Red water
  • Excessive number of water main breaks

A structural liner would be required for the above cases. CWW’s solution is the provision of a continuous pipe-within-a-pipe that is designed to meet structural requirements.

lining

Benefits

  • Long-lasting structural rehabilitation
  • Minimal site disruption – Business continues to move forward – Revenues uninterrupted